Filtration & pressure loss
Specify the particle retention needed, flow rate and acceptable pressure drop. Confirm screen material and access for cleaning or maintenance.
Your products and information will be ready in a moment.

| Model Reference | 7282K |
|---|---|
| Available Sizes | Tube OD 25-102 mm |
| Pressure Rating | PN10 |
| Body Material | Stainless Steel CF8 |
| Connection Type | Clamp (ISO 2852) |
| Working Temperature | -20°C to 120°C |
| Suitable Medium | Water; ethylene glycol solution up to 50% concentration |
| Selection Basis | Catalogue range; exact size, pressure, materials and coolant compatibility confirmed for the project |
| Requested Tube OD | 25 mm · 32 mm · 38 mm · 45 mm · 51 mm · 57 mm · 63 mm · 76 mm · 89 mm · 102 mm |
| Magnetic Filter Option | Without optional magnet · With optional magnet |
Catalogue options. Operating limits depend on the selected size, materials and configuration.
Clamp-connected strainer for removable stainless cooling assemblies. Confirm screen rating, tube outside diameter and access for cleaning.
Applications: Data Centers & AI Cooling
For technical documentation or assistance with your selection, contact Nordic Valves.
Clamp-connected strainer for removable stainless cooling assemblies. Confirm screen rating, tube outside diameter and access for cleaning.
| SIZE | φB mm | L / mm | H / mm |
|---|---|---|---|
| φ25 | φ50.5 | 150 | 2 |
| φ32 | φ50.5 | 190 | 2 |
| φ38 | φ50.5 | 190 | 2 |
| φ45 | φ64.0 | 230 | 2 |
| φ51 | φ64.0 | 230 | 2 |
| φ57 | φ77.5 | 265 | 2 |
| φ63 | φ77.5 | 265 | 2 |
| φ76 | φ91.0 | 320 | 2 |
| φ89 | φ106.0 | 350 | 2 |
| φ102 | φ119.0 | 400 | 2 |
Dimensions use the letter references in the datasheet drawing. Pressure-class columns refer to the specified flange drilling.
| Drawing no. | Part | Material | Specification |
|---|---|---|---|
| 1 | Bonnet | Stainless Steel | CF8 |
| 2 | Sealing Gasket | Rubber | -- |
| 3 | O-Ring | Rubber | -- |
| 4 | Strainer | Stainless Steel | SS304 |
| 5 | Body | Stainless Steel | CF8 |
Material options are shown where listed. Confirm the complete wetted construction for the selected coolant and configuration.

Isolation, balancing, control valves, strainers and flexible connections for facility-water and CDU cooling circuits.
Explore application guidanceSpecify the particle retention needed, flow rate and acceptable pressure drop. Confirm screen material and access for cleaning or maintenance.
State facility-water or CDU / technology-cooling duty, coolant formulation, flow, temperature and pressure. Confirm wetted materials and the exact valve configuration for the project.
Include the required installation drawing, material documentation and testing requirements. Confirm the final configuration and its operating limits with your enquiry.
Include the operating conditions in your enquiry. Add your medium, pressure, temperature and documentation requirements alongside the selected options.
Review quotation basket